Chino, CA
Find out what you are actually dealing with
An inspection is the cheapest thing on this site and the one that saves the most money, because it turns a guess into a number.
Describe the inspection job
Three questions, then the address. Up to three Chino contractors who do this work.
You are on the list.
No provider in Chino is taking requests through this service yet. We are lining them up, and yours is kept until one can.
- Nobody gets your details yet. Your request stays with us and is not passed to any company.
- One email when someone can help. When a provider covering your area can take it on, we email you once and ask whether you want that company, by name, to contact you.
- Deleted after 90 days. If nobody can take it on, or you do not say yes, your contact details are deleted 90 days after your request.
- You decide, or you do not. There is nothing to cancel and nothing to pay us.
Nobody will call you about this request unless you say yes to a company by name.
Before you let anybody on the roof
The things worth pinning down on a inspection job. A contractor who has not raised them has not looked properly.
- Whether the inspection includes going into the attic
- An estimated number of years left in the covering
- Photographs of anything they flag
- Whether the fee comes off the job if you proceed
- A written report, not a verbal summary
A thorough look covers the covering, the flashings, the penetrations, the gutters, the ventilation and the attic side of the deck. If nobody went into the attic, half the inspection did not happen.
Free inspections are tied to an estimate, which is fine as long as you know that going in. Paid inspections buy you a written report that is not attached to somebody wanting the work.
Twice a year is the standard advice, and almost nobody does it. Once after the worst weather of the year is a reasonable compromise.
Locally
The second problem is shaded slopes that never really dry out. Nothing dramatic happens. A slope stays damp most mornings for thirty years, and eventually that is enough.
About inspection here
It is leaking right now. What do I do?
Move what you can out of the way, put a bucket under it, and if there is a bulge in the ceiling put a small hole at its lowest point to let the water out in one place rather than bringing the whole panel down. Then mark your request as an emergency — those go out first.
How long does a re-roof take?
A straightforward asphalt roof on an average house is one to three days. Tile, slate and complex rooflines take longer, and weather stops work more often than anything else.
Do you handle commercial buildings?
Yes. Commercial requests go to contractors who do low-slope and flat systems rather than to residential crews. Say so on the property question and it routes correctly.
I have solar panels. What happens to them?
They come off and go back on, and that is a separate cost, often handled by the solar installer rather than the roofer. If the roof is near the end of its life, do the roof first — removing and refitting panels twice is money wasted.
